This project consisted of the dismantling and complete demolition of the industrial installation dedicated to the production of carbon black, located in the Sines Industrial and Logistics Zone (SILZ). One of the main challenges involved preventing and mitigating the potential environmental impacts that the dismantling operations of a unit of this nature would cause on the environment.